Monday, August 3, 2009

Male Brazilian Wax Miami

ALARM FOR COMPETITION DOPING OF Fanini

DOPING - Fanini launches a new alarm, "is the new Hematide Epo that escapes the controls'
Thursday, July 20, 2009 - In a note published in full Ivano Fanini, owner Love & Life is launching a new alarm doping.Nessun positive (so far) in the Tour 2009. What does it mean? Finally, the cycling was on the right track to turn the page? Difficult to think if we consider that the men of the platoon, and in many cases even the athletes are the same that only a few seasons ago they had one thing in mind: the trick and doping. Moreover, the race for doping goes on frantically. You do not have time to find a test for Cera (see cases Ricco & C last year) seems to have already arrived on the "market" a new product. It's called "Hematide" and, as I said the tam-tam of the platoon, is already circulating in the group, especially at high level. Those, that manage to get this product still under development and not yet officially traded. It 'an epic that goes beyond the wax, which, as you know, it would be inserted in the list of banned products Wada, but there is still no test that can detect it. So if that is still the rule of the past, so dear to some Medical dopatori: "Everything that you do not pick, you take", one should expect that the Tour has not escaped this risk. With all due respect of the various Armstrong, Contador and company credibility of the race and dela francese.Per regard to the American it must be stressed that in the years when he won seven Tour, there was a kind of EPO, which escaped scrutiny as now. This was "Dynepo," or second generation EPO, derived from human cells and animals, thus untraceable for a long time to test. At least until 2007, when it will be recalled, was stopped by his team, Rabobank, Denmark's Rasmussen during his yellow jersey. In France found that Rasmussen also proved positive "Dynepo," but, as acknowledged by the director of the French laboratory of Paris, they could not suspend him. The reason was that the test for the individual "Dynepo" had not yet been officially registered. In fact, the rider also managed to win his case with his company and get a large refund: he had never been disqualified. More recently, a Dutchman Erik Dekker tested positive for "Dynepo" (July 1, 2009) reagion why should I think that this product continues to be used in the peloton, along with the new "hematide. So, as reported by the French press, the suspicion for this tour is a must. E fa bene l’agenzia francese a rifare i test del Tour 2008: se ne vedranno delle belle. Mi domando e chiedo a chi veramente vuole bene al ciclismo se non sia il caso di rifare anche i test del Giro 2008 e della Vuelta. Almeno per i primi dieci della classifica o almeno per i primi tre. Sono convinto che ci sarebbero dei risultati clamorosi. Salterebbe l’intero banco e forse non si potrebbe neppure fare una nuova classifica se si ponesse la clausola della revisione totale delle proprie analisi antidoping prima di essere classificati. In questo quadro non si può non rilevare l’ennesima tragica vicenda, come la morte di martedì in corsa del giovane dilettante di appena 23 anni militante nella più forte squadra toscana. Sono nel ciclismo da tutta la life and for many years the only mention of a death in the race for me was the poor Venotux Simpson on Mont. Now the dead in cycling there are only a dozen in recent years. I am certain that straconvinto pharmacy has its own responsibility. Or is there to conclude that cycling is bad for your health, if it kills people in their twenties that should have a strong physical to have passed all medical tests planned for the competitive practice. Also I can not forget the most recent case in recent days. This is a sample of just 18 years the Junior category Eugenio Bani (58 career victories and No. 1 on the charts performance and leading the national team in Belgium) militant himself in stronger Tuscan junior team and you test positive even with human chorionic gonadotropin, hCG is a real poison for the body umano.Ciò confirm that Tuscany is a land of great champions but unfortunately also the home of the biggest lobbyists. I am increasingly convinced that the entire bike, from beginners to professionals, should be stopped for at least a year. It should put everything on the clean and start over with new rules that do not look at anybody and expel those who are caught in fraud, otherwise the dead will not stop here.

Friday, March 27, 2009

Free Quicktimeepisodes

Nucleare future for the earth?

A government against the environment (3): the nuclear option of Mario Tozzi
ROME. Instead of choosing the way much of the energy renewables, greater efficiency and saving the government takes the old and landlocked nuclear. As if entering a shop wanted to buy a tube radio and wanted to fill up with fuel enriched in tetraethyl lead. Uranium is a fossil fuel (like oil and coal) and will run in a time not very long (less than half a century), which could be considerably reduced, as can be imagined, it will increase its use. It also produces radioactive wastes that remain potentially hazardous for thousands of years: how do you compare it to the sun or wind? This road will not have any results in the fight against climate change and will only increase the dependence the country from fossil fuels (even nuclear) which, as you should know, we do not have any deposit. Implanting a nuclear power plant today requires about 4 billion euro, and the actual cost per kWh produced in this way can only be calculated when the first rejection of older units will become idle, ie, from over ten thousand years. Moreover, with the climate emergency ports and international agreements that impose obligations and time, a resolution does not seem sensible to rely on reactors that will be made not earlier than ten anni.La search for nuclear energy has already burned 90 % of the expenditure on the one on alternative energy sources to fossil fuels. Not more employees only in terms of energy sources, but also from the technology: This is the result of the Italo-French nuclear announced today. To pay, in every sense, will be the citizens-taxpayers, that the State will support with their money, a choice that will penalize them in terms of energy dependence and technology and not allow our country for decades, to really gear up for the fight against CO2 and climate change. Italy, in essence, also from France will depend on the technological point of view, despite the previous experience of insolvency Superphoenix reactor, closed at the end of manifest inefficiency. The EPR project in Finland already show enormous problems in terms of accomplishment and security. Nuclear power in Italy has huge problems of location, being a highly seismic area, filled with the hydrogeological and even smaller spaces and river dried up for most of the year (a phenomenon that will increase with the intensification of the effects of climate change). Nuclear power provides a very modest contribution to the world's energy needs. There is talk of about 6.5%, but this is already overbuilt. The real contribution of nuclear power is even lower than that of the 'hydropower (according to the IEA in 2006 hydropower production amounted to 3,121 TWh TWh in 2793 against nuclear power). According to Moody's, the construction of new nuclear plants would cost far more than the $ 7,000 a kW installed. Not only that Moody's claims that the cost per kWh for nuclear power will grow at a rate of 7% per annum and this would lead to a doubling of the cost per kWh over the next decade. So the bill will increase the Italians, but without improving the energy security of our country who continue to depend on fossil fuels for transportation, building heating and everything else. Nuclear power, in fact, is required, at great cost to produce electricity but in our country (like most countries) the electrical power is less than a quarter of total energy impiegata.Il case of central Finnish Olkiluoto. This case is becoming a paradigm of dubious economic viability of nuclear investment, due to construction delays, increased costs and inefficient use of public funds. As the first reactor built in the liberalized European energy market, when construction began in 2005 was described as evidence that the nuclear industry can compete in this new market due to technological improvements have occurred. To reduce the risk for the buyer - the Finnish utility TVO - the Franco-German company Areva has signed a turnkey fixed price for the new station, regardless of the amount of final expenditure effective for the manufacturer. In addition, the agreement provides for a fine of 0.2% of the cost for each week of delay on the delivery to the first criticality foreseen within 48 months from the laying of the cornerstone. The favorable conditions under the agreement aimed to demonstrate the competitiveness of the 'deal' with the alternatives on the market. In the first year there were a number of technical problems and delays in construction, then made public by the energy regulator in Finland. After 16 months of work the project had fallen behind no less than 18 months, with an increase in costs estimated at around 700 million euros. It should be added that in 2006 following the advances made Areva ha registrato una perdita di 300 milioni di Euro. Va notato che la Bayerische Landesbank che ha guidato un syndicated loan di 1,95 miliardi di Euro per il progetto - che copre il 60 per cento dei costi - ha applicato tassi estremamente vantaggiosi del 2,6 %. Inoltre le agenzie di credito all´esportazione Coface e SEK hanno garantito operazioni di Areva per 720 milioni di Euro. Ciononostante il progetto potrebbe causare una forte perdita per Areva ed in prospettiva anche per l´utility finlandese. La DG Competition della Commissione Europea ha anche indagato sulle particolari condizioni concesse da queste agenzie ad Areva e sulla possibile violazione dei principi di concorrenza nel mercato europeo. E´ chiaro quindi che il progetto Olkiluoto emerge come un sonoro fallimento showing the apparent inability of the nuclear industry to compete in the liberalized energy market that is Europe today, even if they are projects under construction in prime condition and in very advanced countries from the point of view on economic and regulation sicurezza.E not speaking here of the unresolved problem of nuclear waste and possible accidents.